sts114payloadassembly.pdf

(633 KB) Pobierz
Revised
© 2008
Assembly Instructions for STS-114
payload
(Discovery’s Return to Flight)
793828163.019.png 793828163.020.png
Building “Raffaello” Multipurpose Logistic Module
Front
Aft
Make a cylinder as photo shows and glue both conical parts on both ends.
Attached the Docking system
See photos for reference when building this module.
793828163.021.png 793828163.022.png 793828163.001.png 793828163.002.png 793828163.003.png 793828163.004.png 793828163.005.png 793828163.006.png
Note that the circular white
patches are not present for
this mission. These Visual
Targets first appeared during
the
first
missions
for
Leonardo and Raffaello
(STS-102, STS-100, STS-
105, STS-108, and STS-111 )
Building the External Stowage Platform-2
First build the main part of this platform as photo shows. This photo shows the prototype.
793828163.007.png 793828163.008.png
Glue the upper portion of the
platform on top of the main part as
photo shows.
The bottom part is glued on the
underside of the main platform
part.
Note that the arrows on both parts
indicate where is the “Forward”
position.
793828163.009.png 793828163.010.png 793828163.011.png 793828163.012.png
Photo shows the bottom part
under the main platform ready to
be glued.
Letters will indicate which parts
go where.
Photo shows the 2 boxes that are
located on top of the platform, one
is a white box easily recognized
and the other is a triangular
structure where 2 small parts are
glued on both sides.
793828163.013.png 793828163.014.png 793828163.015.png 793828163.016.png 793828163.017.png 793828163.018.png
 
Zgłoś jeśli naruszono regulamin