Dynamic and Aggressive Scheduling Techniques
for Power-Aware Real-Time Systems
Hakan Aydin
, Rami Melhem
, Daniel Mosse
, Pedro Mejıa-Alvarez
Abstract
(hence the CPU speed), has recently become a major research
area for power-aware computer systems. For real-time sys-
tems, the proposed VVS schemes focus on minimizing en-
ergy consumption in the system, while still meeting the dead-
lines. Yao et al.[23] provided a static off-line scheduling al-
gorithm, assuming aperiodic tasks and worst-case execution
times. Heuristics for on-line scheduling of aperiodic tasks
while not hurting the feasibility of periodic requests are pro-
posed in [9]. Non-preemptive power aware scheduling is in-
vestigated in [8]. Concentrating on periodic tasks with identi-
cal periods, the effects of having an upper bound on the volt-
age change rate are examined in [10], along with a heuristic
to solve the problem. Slowing down the processor whenever
there is a single task eligible for execution was explored in
[21]. Lorch and Smith addressed the variable voltage schedul-
ing of tasks with
soft
deadlines in [14]. The static solution for
the general periodic model where tasks have potentially differ-
ent power consumption characteristics is provided in [2].
However, most of the scheduling schemes presented in these
studies, while using exclusively worst-case execution time
(WCET) to guarantee the timeliness of the system, lack the
ability to dynamically take advantage of unused computation
time. In fact, real-time applications usually exhibit a large vari-
ation in
actual
execution times; for example [5] reports that the
ratio of the worst-case execution time to the best-case execu-
tion time can be as high as 10 in typical applications.
Consequently,
dynamically monitoring and reclaiming the
‘unused’ computation time
can be (and, as we show later in
this paper, is in fact) a powerful approach to obtain consider-
able power savings and to minimize the effects of designing
the system with WCET information, which is usually a very
conservative prediction of the
actual
execution time. Addi-
tional improvements are possible thanks to the
statistical
work-
load information; in this paper, we investigate also
aggressive
schemes where we
anticipate
the early completions of
future
executions and
speculatively
reduce the CPU speed. This ap-
proach immediately raises two intertwined questions, namely,
(a) the
level
of aggressiveness under a given probability dis-
tribution of actual workload; and (b) the issue of guaranteeing
the timing constraints even in aggressive modes. It is obvi-
ous that the solutions to these problems should be simultane-
ously practical and efcient, in order to be applicable on-line.
In this paper, we address power-aware scheduling of peri-
odic hard real-time tasks using dynamic voltage scaling. Our
solution includes three parts: (a) a
static
(off-line) solution to
compute the optimal speed, assuming
worst-case
workload for
each arrival, (b) an on-line speed reduction mechanism to
re-
claim
energy by adapting to the
actual
workload, and (c) an on-
line, adaptive and
speculative
speed adjustment mechanism to
anticipate early completions of future executions by using the
average-case
workload information. All these solutions still
guarantee that all deadlines are met. Our simulation results
show that the reclaiming algorithm saves a striking 50% of
the energy over the static algorithm. Further, our speculative
techniques allow for an additional approximately 20% savings
over the reclaiming algorithm. In this study, we also establish
that solving an instance of the
static
power-aware scheduling
problem is equivalent to solving an instance of the reward-
based scheduling problem [1, 4] with concave reward func-
tions.
1 Introduction
In the last decade, the research community has ad-
dressed the low power system design problems with a multi-
dimensional effort [7, 18]. Such on-going research has im-
portant implications for real-time systems design, simply be-
cause most of the applications running on power-limited sys-
tems inherently impose temporal constraints on the response
time (such as real-time communication in satellites).
The
variable voltage scheduling
(VVS) framework, which
involves dynamically adjusting the voltage and frequency
This work has been supported by the Defense Advanced Research Projects
Agency through the PARTS project (Contract F33615-00-C-1736).
Computer Science Department, George Mason University, Fairfax VA
22030.
E-mail: aydin@cs.gmu.edu.
Work done while the author was with
the University of Pittsburgh.
Computer Science Department, University of Pittsburgh, Pittsburgh PA
15260. E-mail: melhem@cs.pitt.edu.
Computer Science Department, University of Pittsburgh, Pittsburgh PA
15260. E-mail: mosse@cs.pitt.edu.
CINVESTAV-IPN. Seccion de Computacion, Av. I.P.N. 2508, Zacatenco,
Mexico, DF 07300.
E-mail:
pmejia@computacion.cs.cinvestav.mx.
Work
done while the author was visiting the University of Pittsburgh.
It goes without saying that dynamic reclaiming and/or aggres-
sive techniques should preserve the feasibility of the task sys-
tem (i.e., no deadline should be missed), even under a worst-
case scenario that may take place after
any
speed adjustment
decision.
We must note that a recent study [11] addressed dynamic
energy reclaiming issues (without speculation) in power-aware
scheduling for cyclic and periodic task models, in the context
of systems with two (discrete) voltage levels. However, sys-
tems which are able to operate on a (more or less) continuous
voltage spectrum are rapidly becoming a reality thanks to ad-
vances in power-supply electronics and CPU design [6, 17].
For example, the Crusoe processor is able to dynamically ad-
just clock frequency in 33 MHz steps [22]. To the best of
our knowledge, the concept of “speculative speed reduction”
was rst introduced by the authors in [16]; however, only tasks
sharing a common deadline were considered.
the worst-case number of processor cycles required by
#%$
, will
be denoted by
+,$
. Note that, under a constant speed
-
(given
in cycles per second), the execution time of the task
# $
is
. $0/
1
2
. A schedule of real-time tasks is said to be
feasible
if each
task
# $
receives at least
45+ $
CPU cycles before its deadline,
where
46+ $87 + $
is the
actual
number of CPU cycles (actual
workload) of
# $
.
We assume that the CPU speed can be changed between
a minimum speed
-
9 $;:
(minimum supply voltage necessary
to keep the system functional) and a maximum speed
- 9
<>=
,
; that is, we normalize the
speed values with respect to
- 9
<>=
. In our framework, the volt-
and that
?
7
age/speed changes take place only at context switch time and
while state saving instructions execute. Pouwelse et al. report
in [19] that the voltage/speed change can be performed in less
than 140
D
s in Strong ARM SA-1100 processor. If not negli-
$;:
7
gible, the ’voltage change overhead’ can be incorporated into
the worst-case workload of each task.
We assume that the process descriptor of the task
#%$
has
two extra elds related to speed settings, in addition to other
conventional elds. The rst one,
- $
, denotes the
current
CPU
!
In this paper, we identify and address three dimensions of
power-aware scheduling for real-time systems and develop ef-
cient algorithms for the periodic task model. Effectiveness
in reducing the energy consumption can be improved only by
a simultaneous consideration of these three dimensions, since
they complement each other. Thus, we present:
speed at which
# $
is executing. The other eld
- $
denotes the
nominal
speed of
# $
, which is the indicator of the “default”
speed of
# $
. For each task that is dispatched, the operating
system sets
-
$ / -E$
, prior to any dynamic speed adjustment.
The power consumption of the processor under the speed
-
is given by
F
GH-JI
, which is assumed to be a strictly increasing
1. A static (off-line) solution to compute the optimal speed
at the task level, assuming worst-case workload for each
arrival
"
(Section 3). In the same section, we also show
convex function, represented by a polynomial of at least sec-
ond degree [10]. If the task
#%$
occupies the processor during
the time interval
K .
"AL
.NMPO
, then the
energy
consumed during this
that solving an instance of the the
static
power-aware real-
time scheduling problem is equivalent to solving an in-
stance of the reward-based scheduling problem [1].
2. An on-line speed adjustment mechanism to dynamically
reclaim energy not used by tasks that complete without
consuming their worst-case workload (Section 4).
3. An on-line, adaptive and speculative speed adjustment
mechanism to anticipate and compensate probable early
completions of future executions (Section 5).
interval is
QRG;.
">L
.NMSI /
.
In our detailed analysis of periodic power-aware scheduling,
we will consider a set
Y /[Z #
of
‘
periodic real-
time tasks. The period of
#
$
is denoted by
ab$
, which is also
equal to the deadline of the current invocation. We refer to the
Ted
invocation of task
#%$
as
#
$Xfg
. All tasks are assumed to be
independent and ready at
. / ?
. Hence, the ready time of
#
$Xfg
is
& $
fg / G
cih
, and its deadline is
()$Xfg /
.
as the total utilization of the task set under
maximum speed
- 9@<A= /pB
, that is,
m
We dene
m
. Note
that the schedulability theorems for periodic real-time tasks
[12] imply that
m
We emphasize once again that, in the context of real-time
systems, all these components should be designed not to cause
any deadlines to be missed even under the worst-case scenario:
the aim is to
meet the timing constraints while simulta-
neously and dynamically reducing power consumption as
much as possible
.
is a necessary condition to have at
least one feasible schedule; hence, throughout the paper, we
will assume that
m
.
3
Optimal Static Solution
2
System Model and Notation
The ready time and deadline of each real-time task
#%$
will
z
{
|}
~
€ƒ‚„…
‡†ˆ
J
!
‰
{
!
Š
R!k~
‹
E
be denoted by
&’$
and
()$
, respectively. The indicator of the
†Œ
~
‹Š‰
{
J
Ž
Before analyzing the periodic model in depth, we cor-
relate
the reward-based scheduling
[1, 3] framework to the
power-aware scheduling of real-time tasks. The reward-
based scheduling framework encompasses real-time schedul-
ing models such as Imprecise Computation [13] and Increased-
worst-case workload in variable voltage/speed settings, that is,
Due to the nature of VVS, the actual execution time is dependent on the
CPU speed, and therefore the worst-case number of required CPU cycles is a
more appropriate measure of the worst-case workload (see Section 2).
Reward-with-Increased-Service [4] that exploit the timeliness
and precision trade-off. We underline that the correlation that
we prove is preserved regardless of the task model (aperi-
odic/periodic or preemptive/nonpreemptive), as long as our
aim is to reach a solution for a given (worst-case) workload.
In the reward-based scheduling framework, each real-time
task
# $
comprises a mandatory part
‘
$
and an optional part
’
Before relating two scheduling problems, we observe that
the convexity of speed/power function allows us to deduce the
following (a formal proof can be found in [3]).
Proposition 1
One can safely commit to a constant CPU
speed during the execution of a task
# $
requiring
+ $
CPU cy-
cles, without increasing the energy consumption.
are de-
noted by
“
$
and
”
$
, respectively. The mandatory part runs
.
The worst-case execution times of
‘
$
and
Note that the determination of
- $
in the RT-PAS problem is
now effectively equivalent to determining the CPU time allo-
cation to
#%$
, which will be denoted by
—b$
G;—
$
/
rst, producing an output of acceptable quality, which is sub-
sequently enhanced by the optional part within the limits of
available computational capacity. To quantify the quality im-
provement, a non-decreasing reward function
•
b$oGV.q$NI
is associ-
. We are
now ready the establish the connection between RT-PAS and
Reward-Based Scheduling problems.
Proposition 2
Solving an instance of RT-PAS problem is
equivalent to solving an instance of Reward-Based Scheduling
problem with concave reward functions.
1
2
ated with each optional execution where
.q$ 7
denotes the
service time
receives. Most of the realistic applications are
best represented by concave reward functions [1, 3, 4, 20]. In
any
feasible
reward-based schedule,
each
mandatory part must
be fully executed by the task deadline
(’$
, however, the optional
Proof:
To prove the statement, we will rst formulate the
computation of optimal speed values as an optimization prob-
lem. The total energy consumption, thanks to the constant
speed assumption per task, can now be expressed as
Q
parts may remain partially executed by the deadlines. Now we
can formally dene the reward-based scheduling problem.
Reward-Based Scheduling Problem
: Consider the
uniprocessor scheduling of a reward-based real-time task set
. Further, observe that the
minimum and maximum speed bounds impose natural lower
and upper bounds on CPU allocation of
# $
.
In other words,
. Given a time point
˜š™
, determine the
op-
the inequality
should be satised. Hence,
the computation of optimal CPU allocation assignments can be
formalized as an optimization problem:
minimize
timal schedule
in the interval
K ?
L
˜ ™
O
, where each mandatory
part
‘
$
complete in a timely fashion before the task deadline
/
—
Z
#
, and each optional part receives service for
. $@7
”
$
units of
time so as to maximize the total system reward
.
The determination of the optimal schedule clearly involves
the computation of optimal optional service times. Noting that
the reward accrued by each optional part
(4)
subject to
(5)
œ
…
×
N
Ø
Ÿ
Ù
does not increase
beyond the upperbound
”
$
, this computation can be expressed
(6)
Now,
consider
the
variable
transformation
“Ý
$
as an optimization problem where the objective is to nd
. $
values
M
so as to:
.
This transformation can be interpreted as follows: First,
#%$
maximize
(1)
G;.
$
Æ
units of CPU time (“manda-
tory” execution). Any allocation exceeding this minimum
amount will be considered as “optional” execution, while the
total CPU allocation (
“æ
$ Æ .q$
) can not exceed the upper bound
1 2
must be assigned at least
subject to
(2)
(3)
.
Finally, the more we allocate CPU time to
#%$
by in-
On the other hand, the real-time power-aware scheduling
problem can be stated as follows.
Real-Time Power-Aware Scheduling (RT-PAS) Problem
:
Consider a CPU with variable voltage/speed
-¨GX- 9 $;: 7 - 7
creasing
.q$
, the more we increase the energy savings thanks
to the speed/power relation. It is not difcult to see that,
by using the above transformation and by re-writing the op-
timization problem given by (4), (5) and (6), one reaches once
again the formulation of the general reward-based schedul-
ing problem dened by Equations (1), (2) and (3). Further,
the reward function
•
$ GV. $ I
above is clearly concave, since
facility, where the power consumption is given by a
strictly increasing convex function
F
GX-JI
, which is a polyno-
mial of at least second degree. Given a set
of real-time tasks, in which each task
# $
is subject to a worst-
) is convex. To see this, we can use the
result from [15] stating that if
ç
and
Ł
are both convex func-
case workload of
+ $
expressed in the number of required CPU
/
—
Z
#
#
:
_
"
L>]^]>]^L
cycles, and a time point
˜ ™
, determine
the schedule
and
the
processor speed
-JGV.PI
so as to minimize the total energy con-
tions and if
ç
is increasing, then
ç
GXŁ^GV—–INI
is also convex. Thus,
sumption
QRG
É
?
L
˜š™
I /
in the interval
K ?
L
˜š™
O
.
by setting
ØbG;.q$qI /
, and observing that the multipli-
cation by
GV.q$ Æ
does not affect the convexity, we justify
the concavity of
•
k$qG;.q$qI /
When considering the periodic task model, the execution time of each task
instance (
˛
œ
‚ˇ
) should be considered as a separate unknown.
.
optimal speed for the static version is
ð
- / - 9@<A= /
Š
B
]
?l?
(from
Proposition 3). If every task presents its worst-case workload
at every instance and we use EDF, then the schedule in Figure
1 (
ß
ü
< :
) would be obtained. Now, suppose that
#
completes
‰ì‰Š
!
Ž
J
l
!%
‡í
o!
ˆ
E
!–
J
‰
z
…
l
îï
…
In this section, we present the static optimal solution to
the variable voltage scheduling problem for the periodic task
model,
assuming that each task presents its worst-case work-
load to the processor at every instance
. We underline that one
can use the equivalence obtained in Section 3.1 and the results
from [1] to justify the proposition (as formally done in [3]);
however, one can also reach the same conclusion by using the
rst principles as outlined below.
T
1
T
1
T
1
0
4
10
14
20
24
30
Proposition 3
The optimal speed to minimize the total energy
consumption while meeting all the deadlines is constant and
equal to
ð
- /
“ˆç
^— Z - 9 $;:
L
m
T
2
T
2
T
2
. Moreover, when used along
0
4
8
14
18
24
28
30
with this speed
ð
-
, any periodic hard real-time policy which can
fully utilize the processor (e.g., Earliest Deadline First, Least
Laxity First) can be used to obtain a feasible schedule.
T
3
T
3
T
3
0
8
10
18
20
28
30
Proof:
First, observe that the convex nature of the power-speed
function suggests that we should try to maintain a uniform
speed while fully utilizing the CPU to the extent it is possible.
If
m
Figure 1. The static optimal schedule,
ß
ü
< :
early at
. / B ?
, leaving an unused computation time of 4 units
leads clearly to
a schedule which is fully utilized (i.e., no idle time), through
stretching out each task in equal proportions (in other words,
in this case, we are achieving a total
effective
task utilization
of
, then using the speed
ð
- / m
before its deadline. If these 4 units of CPU time are used by
(recall that
# $Xfg
is the
c
Ted
instance of task
),
# M fM
will
miss its deadline, if both
#
and
# M fM
require their worst-case
, then
we should use the minimum CPU speed available, to stretch
out task executions as much as possible. In any case, using the
speed
ð
- /
“
œ
ç
^— Z -
9
$;:
). However, if
m
workload.
As we can see, computing and managing earliness is not a
trivial task. Due to the periodic nature of the tasks we consider,
it is clearly impractical to a priori produce and keep the entire
static optimal schedule
ß
ü
< :
will result in a total effective task
utilization which is no greater than 1. Hence, any scheduling
policy which can achieve up to 100% CPU utilization (Earliest
Deadline First, Least Laxity First) can be used to complete all
the task instances before their deadlines with the speed
ð
-
during the execution. In order
to simultaneously address the problems of feasibility and ef-
ciency, while tasks execute, complete, re-arrive dynamically
and the actual schedule is produced, we choose to keep and up-
date a data structure (called
-queue)
that helps to compute the
.
Œ
4 Dynamic Reclaiming Algorithm
The dynamic reclaiming algorithm is based on detecting
early completions and adjusting (reducing) the speed of other
tasks
on-the-y
in order to provide additional power savings
while still meeting the deadlines. To this aim, we perform com-
parisons between the actual execution history and the canon-
ical schedule
ß
ü
< :
, which is the static optimal schedule on
earliness of tasks when they are dispatched. At any time
.
dur-
ing actual execution, the
-queue contains information about
tasks that would be active (i.e., running or ready) at time
.
in
the worst-case static optimal schedule
ß
ü
<
:
(in other words,
-queue is the ready queue of
ß
ü
< :
at time
.
). We assume that
the following information can be obtained for each task from
the
-queue at any time
.
:
which every instance presents its worst-case workload to the
processor and runs at the constant speed
ð
-
, the identity of the task (i.e., task number),
. The CPU speed
is adjusted only at task dispatch times: thus, we should be
able to say whether the task is being dispatched
earlier
than
, the arrival time of the instance (i.e., the period bound-
ary earlier than
.
),
, and if so, determine the amount of additional CPU time
the dispatched task can
safely
use to slow down its execu-
tion; we will refer to this additional CPU time as the
earli-
ness
of the dispatched task. Before providing the details of our
approach, we underline that a simple approach that equates
earliness with previously unused CPU time and and
blindly
slows down the processor is
not
a safe approach. To see
this, consider a 3-task system with the following parameters:
, the deadline of the instance (i.e., the period boundary
later than
.
), and
, the remaining execution time of
# $Xfg
at time
.
in
ß
ü
< :
, under the static optimal speed
ð
-
.
Clearly, given
.
, the
& $Xfg
and
( $
fg
values can be easily com-
puted for the periodic task model.
Note that the
-queue at
time
.
contains information about all instances
# $Xfg
such that
. The
worst-case utilization of the task set is equal to 1.00, hence the
, and
&o
“æ
$Xfg G;.PI
v?
. The
-queue contains at
most
‘
elements, since the number of tasks in the ready queue
can never exceed the total number of tasks in any schedule.
Therefore, we will omit the instance number while referring to
Observation 1 stems from the following: (a)
-queue is or-
dered according to EDF* order, (b) every arriving task pushes
its remaining worst-case execution time (under nominal speed)
into the
-queue only once, (c) the queue is updated only at
-queue elements, whenever clarity is not compromised.
Our approach assumes that tasks are scheduled according
to EDF* policy. EDF* is the same as EDF (Earliest Deadline
First [12]), except that, among tasks whose deadlines are the
same, the task with the earliest arrival time has the highest pri-
ority (FIFO policy); in case that both deadline and arrival times
are equal, the task with the lowest index has the highest prior-
ity. This EDF*
priority ordering
is essential in our approach
because it provides a total order on the priorities. Further, we
assume that the
-queue is also ordered according to EDF* pri-
the head, reecting the fact that only the task with the high-
est EDF* priority would be running in
ß@
ü
< :
, and (d) a task
that would have nished in
ß
ü
< :
is removed from the
-queue.
This effectively yields
a dynamic image
of the ready queue in
at time
.
.
Note that the dynamic reduction of
&o
“æ
$Xfg
in R3 above does
not need to be performed at every clock cycle; instead, for
efciency, we perform the reduction whenever a task is pre-
empted or completes, by taking into account the time elapsed
since the last update. The above approach relies on two facts:
rst, the speed adjustment decision will be taken only at ar-
rival/preemption and completion times, and it is necessary to
have an accurate
-queue only at these points (if speeds are to
orities. We denote the EDF* priority-level of the task
by
(
$
(low values denote high priorities).
At this point, we are ready to relate the
-queue with the
computation of earliness factor. Let
3
$
denote the remain-
ing worst-case execution time of task
# $
under the speed
-
at
time
.
. Further, set the nominal speed
- $–/
for each task
# $
.
Proposition 4
For any task
#%=
which is about to execute,
be changed at other points, the update of
&
o
“
$
fg
must reect
that). Second, between these points, each task is effectively
executed non-preemptively.
We are now ready to present our Generic Dynamic Reclaim-
ing Algorithm, GDRA, shown in Figure 2. Procedure Speed-
Reduce
G;# =
L
any unused computation time (slack) of any task in the
-
queue having strictly higher priority than
#%=
will contribute
to the earliness of
#%=
along with already nished work of
#%=
, in Figure 3, will be used by GDRA to re-
duce the speed
-
of
# =
, by allocating an extra
in the actual schedule.
That is,
total earliness
of
#%=
is no
units of time
to
# =
under worst-case remaining load, subject to
- 9 $;:
con-
less than
= G;.PI /
straint. GDRA is “generic” in the sense that the amount of
additional time allocation
in step 5.2 is not specied, it may
.
3
Ó
$
assume any value between 0 and
= G;.PI
without compromising
To understand the above result, note that when
#%=
is being dis-
the correctness.
The following theorem establishes that the schedules pro-
duced by GDRA are always
ahead
of
ß
ü
<
:
.
patched, tasks with higher priority that are still in the
-queue
must be already nished in the actual schedule (since
# =
cur-
rently has the highest EDF* priority), but they would have not
yet nished in
ß
ü
< :
.
Theorem 1
At any time
.
during the execution of GDRA,
Implementing the
-queue:
The
-queue can be easily
, for any ready task
# $
.
implemented using the following rules:
The formal proof of this theorem can be found in [3]. Focus-
ing exclusively on task completion times, the theorem implies
that in the actual schedule no task instance completes later than
its completion time in
ß
ü
< :
R1. Initially the
-queue is empty.
G;.PI
7
&
o
“
$
GV.PI
R2. Upon arrival, each task
#
g
”pushes” its worst-case execu-
(which is feasible), proving the
tion time under nominal speed
-Eg /
to the
-queue in
correctness of GDRA:
the correct EDF* priority position (this happens only once
for each arrival, no re-push at ’return from preemptions’).
Corollary 1
GDRA yields a feasible schedule under EDF*
priority for a workload no greater than the worst-case work-
load.
R3. As time elapses, the elements in the
-queue are updated
(consumed) accordingly: the
&N
“Ý
$Xfg
eld at the head of
-
Note that any specic algorithm should specify the
exact
amount of earliness parameter
, to use for speed reduction.
queue is decreased with a rate equal to that of the passage
of time. Whenever the
&o
“
$Xfg
eld of the head reaches
One natural choice in Rule 5.2 of Figure 2 is to use
/
=
G;.PI
,
zero, that element is removed from
-queue and the up-
that is, to reduce the speed so as to prot from the full earliness.
We call this variation simply
Dynamic Reclaiming Algorithm
(DRA).
date continues with the next element. No update is done
when the
-queue is empty.
Observation 1
At time t, the
-queue, updated according to
the rules R1, R2 and R3, contains only the tasks that would be
ready at time t in the static optimal schedule
ß@
ü
< :
. Further, the
eld contains the remaining allotted time of each active
instance
#%$Xfg
at time t in
ß
ü
< :
.
%$–
Ž
J
As presented in [21], one can further slow down execution
when there is only one task in the ready queue and its worst
!
Plik z chomika:
atari666
Inne pliki z tego folderu:
Analysis of the PASR Standard and its usability in Handheld Operating Systems such as Linux.pdf
(84 KB)
Compiler-controlled and Compiler-hinted Voltage Scaling Approaches.pdf
(144 KB)
Dynamic and Aggressive Scheduling Techniques for Power Aware RTS.pdf
(181 KB)
CRC.Press.The.Compiler.Design.Handbook.2nd.Edition.Dec.2007.pdr
(0 KB)
Evaluation and Modeling of Power Consumption of a Heterogeneous Dual-Core Processor.pdf
(1804 KB)
Inne foldery tego chomika:
Zgłoś jeśli
naruszono regulamin